By the end of this lesson you will be able to
- Write a one-page report that uses your checked sources and names them.
- Build a spreadsheet that calculates the daily cost of four appliances with formulas.
- Create a five-slide presentation that is clear and readable.
- Send the deliverables in a professional email with correct attachments.
- Back up the finished project using the 3-2-1 rule and prove that the backup works.
In part 1 you gathered and checked your materials. Now you turn them into the things the community centre asked for: a report, a spreadsheet, a presentation and an email. Each uses a skill from earlier in the course, so this lesson is mostly about joining them up and checking the result as a careful professional would. At the end you protect the work with a backup and complete a short simulated office task that tests the whole chain.
From research to deliverables
A Deliverable is something you hand over. The brief asked for four: a one-page report, a spreadsheet, a five-slide presentation and a covering email. The safest order is to build them from the most factual to the most visual. Write the report first, because it forces you to decide what you actually know. Do the spreadsheet next, because it produces numbers the report and slides can quote. Make the slides last, using only points that already exist in the report. Write the email at the very end, when you know exactly what is attached.
- Step 1: ReportFacts and sources
- Step 2: SpreadsheetCosts
- Step 3: SlidesFive points
- Step 4: EmailAttach files
- Step 5: CheckRead again
- Step 6: Back up3-2-1
Read this figure as text
A flow of six steps from report to spreadsheet, slides, email, checks and backup.
A flow of six numbered steps. 1 Report: decide what you know, name sources. 2 Spreadsheet: calculate the costs. 3 Slides: five clear points from the report. 4 Email: attach the final files. 5 Check: read everything once more. 6 Back up: three copies, two kinds of storage, one elsewhere.
The one-page report
A good short report has a clear title, a one-sentence summary, a few headed sections written in plain words, and a list of sources at the bottom. Your audience is families with no technical knowledge, so explain every unit and avoid jargon. Use the facts in your source log, written in your own words, and mention the source in brackets after each fact. Use the heading styles of your word processor, not bold text of a larger size, so that the structure is real and the document can be navigated and read aloud by assistive tools.
- Marker 1: Summary first
- Marker 2: Real heading style
- Marker 3: Fact with its source
- Marker 4: Short, clear habits
- Marker 5: Source list
Read this figure as text
A simulated one-page report titled Saving electricity at home with numbered marks on its parts.
A page titled Saving electricity at home, prepared for Riverside Community Centre (fictional). Marker 1 points to the one-sentence summary: most savings come from a few habits. Marker 2 points to a heading, Where the electricity goes. Marker 3 points to a fact followed by its source in brackets, Example Energy Agency. Marker 4 points to a heading, Three simple habits. Marker 5 points to the Sources list at the bottom with title, publisher and date visited.
Write and save the report
Step 1: Open a new document
In your word processor choose a new blank document. Set the title with the Title style and the section names with Heading 1 or Heading 2 styles.
You should see: The headings appear in the styles list or navigation pane.
Step 2: Write from the source log
Write four short sections from your log. After each fact put the source in brackets. Keep the whole text to one page.
You should see: The text fits on a single page at a readable size, around 11 or 12 points.
Step 3: Add the source list
At the bottom list each source with its title, publisher and the date you visited it, as you recorded in the log.
You should see: Every bracketed source name appears again in the list.
Step 4: Save two versions
Save the editable file as
2025-06-10_electricity-report_v01.docxor.odtin03-working. Then export a PDF into04-final: in LibreOffice choose File, then Export as, then Export as PDF; in Word choose File, then Save As, then PDF.You should see: A PDF exists in
04-finalthat opens in your PDF viewer and looks the same as the document.
The cost spreadsheet
The brief asks you to compare the daily cost of four appliances. Electricity is measured in kilowatt-hours (kWh). A kilowatt (kW) is a measure of how fast an appliance uses power, and one kilowatt-hour is that use continued for one hour. The calculation has two steps. First, power in kW multiplied by hours used per day gives kWh per day. Second, kWh per day multiplied by the price per kWh gives the cost per day. Put the price in its own cell, so that if it changes you edit one cell and every answer updates. The figures below are made up for practice. Use figures from your own sources in your own project.
| Row | A | B | C | D | E |
|---|---|---|---|---|---|
| 1 | Appliance | Power (kW) | Hours per day | kWh per day | Cost per day |
| 2 | LED bulb | 0.01 | 5 | 0.05 | 1.25 |
| 3 | Fridge | 0.15 | 24 | 3.60 | 90.00 |
| 4 | Kettle | 2.00 | 0.25 | 0.50 | 12.50 |
| 5 | TV | 0.10 | 4 | 0.40 | 10.00 |
| 6 | Total | 4.55 | 113.75 | ||
| 7 | |||||
| 8 | Price per kWh | 25.00 |
- Marker 1: Price in one cell
- Marker 2: Formula uses the fixed price
- Marker 3: Total with SUM
Read this figure as text
A simulated spreadsheet listing four appliances with power, hours, kWh per day and cost per day.
A spreadsheet. Row 1 has the headers Appliance, Power (kW), Hours per day, kWh per day and Cost per day. Row 2 LED bulb 0.01 kW, 5 hours, 0.05 kWh, cost 1.25. Row 3 Fridge 0.15 kW, 24 hours, 3.60 kWh, cost 90.00. Row 4 Kettle 2.00 kW, 0.25 hours, 0.50 kWh, cost 12.50. Row 5 TV 0.10 kW, 4 hours, 0.40 kWh, cost 10.00. Row 6 Total 4.55 kWh and 113.75. Row 8 holds the price per kWh, 25.00, a made-up price, in cell B8. Cell E2 is selected and its formula bar shows the formula equals D2 times dollar B dollar 8. Marker 1 points to the price cell, marker 2 to the formula, marker 3 to the total.
The dollar signs in $B$8 lock the reference, so when you copy the formula down the column it still points at the price cell. This is an absolute reference, from the formula lessons. In D2 type =B2*C2, in E2 type =D2*$B$8, copy both down to row 5, and in D6 and E6 use =SUM(D2:D5) and =SUM(E2:E5). If your program expects semicolons or another separator, it will tell you. Check one row by hand: the kettle uses 2 kW for a quarter of an hour, which is 0.5 kWh, and 0.5 times 25 is 12.50.
The five-slide presentation
Slides support a speaker; they do not replace one. Use one idea per slide, a short title, at most four short bullets, and a large font. Five slides is a tight limit, so choose carefully: a title slide, the problem, the numbers from your spreadsheet, three habits, and sources with a closing line. If you include a chart of the daily costs, label the axes and write the key message in the slide title, for example: The fridge costs the most per day because it never stops.
Read this figure as text
Five mini slides: title, where it goes, daily cost chart, three habits, sources.
Five mini slides, all rated good. Slide 1 title: Saving electricity at home. Slide 2 bullets: Where the electricity goes; the fridge never stops; the kettle is short but strong. Slide 3 chart: Daily cost of four appliances, with the fridge highest. Slide 4 bullets: Three habits: lights off, no standby, full loads only. Slide 5 bullets: Sources and thank you.
Check the finished deck by running it from the start in slideshow mode and reading every slide from the back of the room, or from as far from the screen as you can. If you cannot read it, enlarge it. Add a short description to any chart or picture so that people using a screen reader can follow it. Save the editable file in 03-working and export a PDF copy into 04-final, because a PDF looks the same on every device.
The covering email
The covering email is the first thing Ms Otieno reads, so it must be short and complete. Use a clear subject, a polite greeting, one paragraph that says what is attached, one line about what you need from her, and a signature. Attach the final files only, never the working drafts. Compressed files can help if the total is large, but many email services refuse messages above roughly 20 to 25 megabytes, so check sizes first.
To: njeri.otieno@example.org
Subject: Electricity briefing: report, spreadsheet and slides
Dear Ms Otieno,
Please find attached the one-page report, the cost spreadsheet and the five-slide presentation for Saturday's workshop. Every fact names its source. Please tell me if you would like any change.
Kind regards, Amina Wanjiru
- Marker 1: Specific subject
- Marker 2: Short, polite, complete
- Marker 3: Final files only
Read this figure as text
A simulated email composer with a subject line, a polite short message and three attachments.
A simulated email window. To: Ms Njeri Otieno at an example.org address. Subject: Electricity briefing, report, spreadsheet and slides. The body reads: Dear Ms Otieno, please find attached the one-page report, the cost spreadsheet and the five-slide presentation for Saturday's workshop. Every fact names its source. Please tell me if you would like any change. Kind regards, Amina Wanjiru. Three attachments are listed: the report PDF, the spreadsheet and the slides PDF. Marker 1 points to the subject, marker 2 to the message, marker 3 to the attachments.
Back up the project
Work you cannot afford to lose should exist in more than one place. The 3-2-1 rule is a simple standard: keep three copies of the data, on two different kinds of storage, with one copy somewhere else. For this project that could be the folder on your laptop, a copy on an external drive or USB drive, and a copy in cloud storage. The reason is that different things go wrong: a drive can fail, a laptop can be stolen, a fire can reach everything in one room.
Read this figure as text
A network picture showing the laptop, an external drive at home and cloud storage on the internet.
Three nodes. Inside a zone labelled Home: a laptop holding copy 1, the working project folder, joined by a wired link to an external drive holding copy 2. Outside the home zone, in a zone labelled Internet: cloud storage holding copy 3, joined to the laptop by a wireless data link labelled upload. The caption explains that copy 1 and 2 are two kinds of storage at home and copy 3 is the one kept elsewhere.
Copy the project to an external drive
Use only a drive that you own and that holds nothing you need to keep unchanged. Copying never deletes the original.
Step 1: Plug in the drive
Connect the external drive. Open Files.
You should see: The drive appears in the sidebar with its name.
Step 2: Copy the folder
Right-click the
electricity-briefingfolder and choose Copy. Open the drive in the sidebar, right-click an empty space and choose Paste.You should see: A folder of the same name appears on the drive and a progress indicator finishes.
Step 3: Eject safely
Click the small eject icon beside the drive in the Files sidebar, then unplug it when the icon disappears.
You should see: The drive vanishes from the sidebar and nothing complains about unsafe removal.
Step 1: Plug in the drive
Connect the external drive and open File Explorer.
You should see: The drive appears under This PC with a drive letter.
Step 2: Copy the folder
Click the
electricity-briefingfolder, pressCtrlandC, open the drive, click an empty space and pressCtrlandV.You should see: The folder appears on the drive and the copy dialog closes without errors.
Step 3: Eject safely
Right-click the drive in File Explorer and choose Eject, then unplug it when Windows says it is safe.
You should see: The drive disappears from This PC.
A backup that you have never opened is only a hope. After copying, test the backup: plug the drive in again, open the copy, and open at least one file from each of 04-final and 03-working. For the cloud copy, upload the folder with your cloud service, as in the cloud storage lesson, then open one file from the website to prove it uploaded completely. Record the date of the backup in a small text file such as 00-backup-note.txt.
Final security and quality checks
Before you call the project finished, run through a short checklist. It is what people in offices do before sending anything out.
- Open each final file from
04-final, not from memory, and read it once from top to bottom. - Check spelling, numbers and units. Do the report, slides and spreadsheet quote the same figures?
- Check that every fact still has a source in the source log and in the report.
- Remove private details: your home address, other people's names, tracked changes and hidden comments.
- Use a strong, unique password and two-step sign-in on the email and cloud accounts, and never type a password into a link in a message.
- Check that the computer is up to date and that the files came from you, not from an unexpected download.
The workplace simulation
The simulation below is a final task in a pretend office. You will research, organise, write, calculate, present, send and back up in one sitting, with the same steps you have just practised, and it will tell you which parts to review. Everything in it is fictional and runs inside this page. Nothing is sent or saved outside it.
Work through the pretend office task from start to finish, then read the feedback.
Loading labβ¦
Common mistakes
β Instead of: Making slides first and writing the report afterwards.
β Do this: Write the report first, so you know your facts, then build the slides from its main points.
β Instead of: Attaching the working drafts and the final files together.
β Do this: Attach only the finished files from
04-final, with names that make their purpose clear.β Instead of: Copying the project to one USB drive and calling it backed up.
β Do this: Follow 3-2-1: keep the original, a second kind of storage and a copy elsewhere, and open files from the copy to test it.
β Instead of: Typing the price into every formula as a number.
β Do this: Put the price in one cell and refer to it with an absolute reference such as
$B$8.
If something goes wrong
- The formula shows a hash or error sign, or the total looks far too large.
- Check that the cells hold numbers, not text. Make sure the decimal separator matches your settings, and that the SUM range covers only rows 2 to 5. Calculate one row by hand to find where it goes wrong.
- The email says the attachments are too large.
- Use the exported PDFs instead of editable files, make sure no images are huge, and compress the slides' pictures. If it is still too large, upload to cloud storage and share a link instead.
- My report spills onto a second page.
- Cut the least important sentence, reduce spacing between paragraphs a little, or trim the margins slightly. Do not shrink the font below about 11 points.
- The external drive does not appear after plugging it in.
- Try another port and make sure the cable is firm. Wait several seconds. If it still does not appear, try another computer or use cloud storage for now, and see the earlier lessons on storage troubleshooting.
Key terms
- Deliverable
- A finished item you have been asked to hand over, such as a report or a spreadsheet.
- 3-2-1 rule
- Keep three copies of your data, on two kinds of storage, with one copy kept somewhere else.
- Backup
- A separate copy of your files kept so you can get them back if the originals are lost or damaged.
- A file type that keeps a document looking the same on every device.
- Cloud storage
- Online space where a company keeps your files so you can reach them from any device.
Practise it for real
Reading is not the same as being able to do it. Complete these on your own computer, then tick only what you have actually done. These ticks are your own honest record: nothing checks them for you.
Produce the deliverables and back them up
Using your part 1 materials, write the one-page report with sources, build the four-appliance cost spreadsheet with formulas and a single price cell, create the five-slide presentation, and export PDFs of the report and slides into 04-final. Write the covering email and send it to yourself or save it as a draft. Copy the whole project folder to an external drive or cloud folder, then reopen two files from the copy.
Challenge: review your own work like a manager
Without prompts, check all your deliverables against the brief. Make a list of every requirement and tick it off with evidence. Fix at least two weaknesses you find, for example an unlabelled chart or a missing source. Save the new versions with new version numbers and move the old ones to 99-archive. Update the backup and write the date in your backup note.
Knowledge check
7 questions. You need 80% to pass. Mistakes here are part of learning, and you can retry as often as you like.
Summary
- Produce the deliverables in a sensible order: report, spreadsheet, slides, email, then checks and backup.
- Cite every fact with a source in the report and keep the source list at the bottom.
- Put assumptions such as price in one labelled cell and check one result by hand.
- Send only final files in a short, clear email, after checking the address and attachments.
- Follow the 3-2-1 rule and test the backup by opening files from it.
Checklist: can you do these?
Marking a lesson as read does not prove you can do it. Skills count as demonstrated when you pass the quiz (not yet) and complete the practical tasks (not yet).
Related lessons
References and further reading
Official sources for details that can change between versions.
- Backing up your data (UK National Cyber Security Centre)
- LibreOffice Writer Guide (The Document Foundation)
- LibreOffice Impress Guide (The Document Foundation)